Our Completed Work

Myerscough College

Myerscough College hired us to install the foundations for their new Sports centre.

We started out by removing the existing carparks and bases already at the site, before installing ringbeams and drainage attenuation tanks.

We are also forming a football pitch on this site and a MUGA pitch. All of the external works were completed by ourselves which included the external concrete yards and soiling up the planted areas of the site

Bury College

The STEM Centre, The facility at the Millennium campus is part of the college's response to an increased demand for construction trade skills. The development will provide workshops, classrooms and a drop-in IT centre.

We have been carrying out the Full Groundworks package on this job involving the Foundations, Drainage and all of the External works on site.

Cromwell Building

Ongoing in Salford we are carrying out the Groundworks package for a brand new Industrial Unit. This is a 1200m2 Building with the need for the concrete slab to be a powerfloated finish.

We also completed all the foundations, all the drainage, and the external car park and kerbing on site. In this car park there was an attenuation tank that holds 80m3 to control the surface water.

Hesketh House

Hesketh House is an NHS National Pensions Office

On this Project we worked with Sir Robert McAlpine to complete the Full Groundworks Package

This involved all the Courtyard works, the Brick Planters, Drainage, the Canopies, our works didn’t stop here.

We also reinstated the Gardens at the front of the building with a new car park formed with Grasscrete Blocks and Paving area’s for footpaths into and around the building

The end product is one of our most aesthetically pleasing

Largs, Sports Scotland

With the company having Nation Wide coverage we get to all corners of Great Britain completing work for different clients

This contract was for a new 3500 square metre Membrane Building. This building was to hold 2 internal football pitches for training up and coming athletes.

Urban Search & Rescue (USAR), Chorley

The project consisted of the new build of an Urban Search And Rescue (USAR) facility in Chorley. This scheme is part of the overall site redevelopment for Lancashire Fire & Rescue and is located adjacent to the Fire Station.

We were on site to complete the Full Groundworks Package, this included the access road that needed reinstating for Heavier Traffic. We also completed the Foundations and all the Drainage within site and down the new access road.

Bentham Primary School, New Build

Bentham Primary School was a new build primary school to replace the existing High Bentham Primary School. This old school was in dire need of refurbishment.

The site started as a Greenfield site before we went in with Machines to strip and level.

We completed the Foundations for the building as well as a large attenuation Tank to take all the water from the extra hardstanding area’s made by ourselves with the external works. This involved Tarmacing, Kerbing, and Street Furniture.

We also completed all of the Streetworks (278) on this site installing new school signage and Zebra crossings.